The Kenyan High Commissions in Abuja (Nigeria), Berlin (Germany), and Paris (France) are in deplorable conditions with leaking roofs that require urgent renovations, the Auditor-General Nancy Gathungu has revealed.
Ms Gathungu said physical verification of the Kenyan High Commission in Abuja revealed that the roofs of the chancery building, the high commissioner’s residence and the staff quarters were leaking and required urgent renovation.
In an audit of the sampled missions for the year to June 2024, Ms Gathungu said the Kenya Mission building in Berlin had defects such as damaged roofs and leakages at the attic terrace balcony, cracks on the walls, the gates hydraulic and locking system, the veranda, exterior ceiling on the first floor damaged and paint peeling all-round the building among other defects.
“Although officers from the Public Works visited the Mission and made recommendations on the works required, repairs were yet to be done as at the time of audit in August 2024,” Ms Gathungu said in her latest report.
Kenyan Embassy in Berlin.
Photo credit: Pool
“Further, two deregistered motor vehicles, which had been approved for disposal, remained unsold. The vehicles remained parked on the Mission premises and continue to deteriorate.”
Ms Gathungu said an inspection of the building carried out following the end of the tour of duty by the immediate former Head of Mission revealed that various items from the inventory list were missing.
She said no explanation or evidence of action taken to establish the loss was provided. Ms Gathungu said the household items and assets previously used by the former Head of Mission were inadequately stored in the Kenya House garage, leading to their continued deterioration.
“There was no established policy governing the management and handling of household items at the conclusion of an officer’s tour of duty,” Ms Gathungu said.
At the Kenyan Mission in Paris, France, Ms Gathungu said physical verification of the chancery and review of the State Department for Public Works assessment and inspection report of the Kenya’s Chancery in Paris revealed major cracks in the wall of the chancery running from the ground floor to the third floor.
She said there was also evidence of basement and yard flooding, ceiling leaks and pealing wall paint. Ms Gathungu said the report outlined the poor state of the Ambassador’s residence in Paris with damaged fittings, rood tiles, and corroded gutters due to lack of routine maintenance.
Ms Gathungu said no repair work had been done to address the matter. She also flagged the lack of title documents for Kenya’s Missions in Tel Aviv, Israel and Riyadh (Saudi Arabia).
She said a review of documents indicated that the Republic of Kenya owned a chancery building and an official residence in Riyadh. However, the Mission had only copies of the sale agreements with no evidence that the Embassy had been included in the ownership documents.
In Tel Aviv, Kenya owned registered office known as sub parcels 11, 12 and 13 in parcels 405, Block 6109 on which the building named Beit Zaksenberg stood.
Ms Gathungu said the sale agreement dated December 1996 states under section 6.2 that the sellers undertake to register the right of ownership to the unit in the name of the purchaser at the Lands Registration office within 24 months of the date of handing over possession.
Auditor-General Nancy Gathungu.
Photo credit: File | Nation Media Group
“However, there was no evidence provided of a registered right of ownership of the sub-parcels 11, 12 and 13. In addition, the building did not have any insurance cover,” Ms Gathungu said.
“In the circumstances, the State Department did not comply with section 72(1)(a) and (b) of the Public Finance Management Act, 2012 which requires accounting officers for the National Government entity to be responsible for the management of the entity’s assets and liabilities and manage the assets in a way which ensures that the national government entity achieves value for money in acquiring, using and disposing of those assets.”
In Dar es Salaam, Tanzania, Ms Gathungu said the Mission was located in a five-acre parcel of land in Dodoma and the title was issued.
However, the land had not been secured through fencing, hence increased risk of encroachment. The Mission also had two other houses in Mikocheni whose renovations stalled in the year 2020.
Ms Gathungu said Kenya Mission in Beijing, China, was in the same compound with the Ambassador’s residence but there were no CCTV cameras for monitoring activities within the building.
The Beijing Mission also had no security guards manning it, and there were no smoke detectors to provide early warning in case of a fire outbreak.